Electrical power distribution boards

Energy K got request to build electrical power distribution boards, install it and do the commissioning. Goal was to produce 5 power distribution boards. From project design to assembly on our production facilities, deliver to customer and install it – build cable routes, pull main power cables, connect end users. And finally – switch on the power.

MCC room electrical installation

MCC room – power distribution electrical installation. The scope of works was cable routes and cables installation from power inlet to machines.

Wood processing factory

Project scope – wood processing factory electrical installation from scratch based on customer project. Energy K electricians were responsible for cable ladders and trays installation, cables from 0.5 to 240 mm² implementation and end user connection (machinery for wood industry).

El installation for medical care center

ENERGY K is doing full scope electrical installation works at the medical care center. As part of it will be used as a hospice, special requirements for installation of specific equipment as well as systems are rised. Also as the mater of fact we have tight schedule since the launch of the medical center can […]

New partnership with Caverion

Wide range of electrical installation at Northvolt Gigafactory. All our crew divided to small teams. Some of the teams are taking care of power cable installation, including cable ladders and preparation of cable ends for connection. Other teams are taking lightening implementation activities. As well other groups are taking responsibility of main cable routes installation. […]

Low voltage power cables laying

Our task was to lay and connect hundreds of meters of low voltage power cables on a short notice and with decent work quality as we are used to. Despite of the very tight work schedule, teams of ENERGY K’s electricians managed even overcome the schedule and leave our dear client ApQ El in a […]

El installation for LEED Gold certified office building

ENERGY K just started a complete electrical installation for Gree office in the heart of Kiruna, Sweden, which will be certified for LEED gold. Our scope of works are from power inlet to switches, lighting and building management system.

Complete electrical installation for used plastic recycling line

Complete electrical installation and start up project for used plastic recycling line, which length is up to 70m. Total installed power 1200kW and current 2200A. Cable installation dimmensions 0.75mm2 to 240mm2. Taking into account that it’s used equipment client needed a reliable partner to handle the project properly and on time. That’s why he choosed […]

Electrical installation works at new Swedish landmark

ENERGY K is backing up its client Bravida at the Swedish new landmark Karlatornet in Gothenburg. It will be the tallest building in Sweden with total of 73 floors and our task over there is: Full electrical installation of HVAC system Cable trays Valves and pumps connections Fine tune and testing Connect all control cabinets […]

Electrical installation at Postpac logistic center

Our scope of works – full internal electrical installation. Since start of the work at this site our electricians have been implementing more that 500 LED light beams (full scope – from installation till final positioning and start up), cable profiles, ladders, and cabling of course.  Houses, industrial plants, data centers and now logistic center. […]